Next 30 days in Stanly
All events →
Stanly CountyTHE INDEPENDENT GUIDE
A rural road through farmland in Stanly County, North Carolina
Home / Services / Permits & planning
Building · Zoning · Septic & wells · Driveways · Fire · Lakes

Stanly County permits, explained.

Who issues what — the county or your town — what it costs, and the order to do it in. Answer two questions and get your permit checklist.

Photo: DiscoA340 / Wikimedia Commons, CC BY-SA 4.0

1Building inspections are countywide. Stanly County Building Codes Enforcement inspects in every town, including Albemarle.
2Zoning depends on location. Inside a town (or its extraterritorial area) the town signs off first; elsewhere it’s county Planning & Zoning.
3Septic and wells are county Environmental Health. Your septic Construction Authorization comes before the building permit.
4One portal. County applications, fees and inspection requests run through OpenGov.
Permit finder

What do you need, and who issues it?

This finder summarizes published county and town procedures as of October 2026. Requirements change and individual properties differ — always confirm with the office named before you build.

County or town?

Who handles what, town by town.

WhereZoning / land useBuilding, electrical, plumbing & mechanicalFire code reviewNotes
Unincorporated countyCounty Planning & ZoningCountyCounty Fire MarshalZoning permit $100 per dwelling
AlbemarleCity plan approval + City Coordination FormCounty (city routes plans to county)CityCity issues its own floodplain permits and addresses
LocustCity Zoning Compliance PermitCounty — or Cabarrus County for Cabarrus parcelsCountyLocust straddles Stanly and Cabarrus
NorwoodTown Municipal Coordination Form; ETJ up to 1 mileCountyCountyTown street driveway permit $25
OakboroTown zoning officer, incl. ETJCountyCountyTown assigns addresses
StanfieldTown zoning permit ($40 residential)CountyCountyETJ applies near town
RichfieldTown zoning compliance ($100)CountyCountyTown assigns addresses
New LondonTown zoning ordinance, Planning Board & BOACountyCountyConfirm sign-off with town hall
MisenheimerVillage zoning ordinanceCountyCountyConfirm sign-off with village hall
Badin · Red CrossConfirm with town hallCountyCountySome former Red Cross tracts remain county-zoned

Sources: Stanly County Central Permitting and Inspections pages; Albemarle, Locust, Norwood, Oakboro, Stanfield, Richfield and New London planning pages and fee schedules. “ETJ” means a town’s extraterritorial jurisdiction just outside its limits.

Step by step

Building a house in unincorporated Stanly County.

  1. 1Address & zoningRequest an address, then get zoning compliance from county Planning & Zoning ($100 per dwelling).
  2. 2Septic & wellEnvironmental Health site evaluation ($150), Improvement Permit, then Construction Authorization. Well permit $225.
  3. 3DrivewayOn a state road? Apply to NCDOT for a driveway permit — no fee, about four weeks or less.
  4. 4Building permitApply on OpenGov with all trades, contractor licenses (or owner affidavit) and a lien agent.
  5. 5InspectionsSchedule each inspection in the portal; results are paperless.
  6. 6Certificate of occupancyIssued after Inspections, the Fire Marshal and Zoning all approve.
Fee estimator

Ballpark your county permit costs.

For a new single-family house in the county’s jurisdiction. The county values residential work at $150 per heated square foot and $100 per unheated square foot; the building permit is 0.5% of that value.

Estimate from the county’s FY 2025-26 adopted fee schedule. Trade, plan-review, re-inspection and town fees can add to it; septic Construction Authorization ranges from $75 to $475 by system type (the estimator uses $75). Confirm with Central Permitting.

Good news

When you may not need a building permit.

  • Work of $40,000 or less on a single-family home, farm building or commercial building — unless it touches load-bearing structure, plumbing, HVAC, electrical, adds roofing or involves fire code items. You still need county zoning clearance.
  • Small sheds up to 12 × 12 ft (144 sq. ft.), with no side over 12 ft, take a “non-required permit” applied for in person — zoning and Environmental Health still sign off.
  • Bona fide farm buildings skip the building permit, but need zoning and Environmental Health clearance plus Schedule F documentation.
  • Owner-builders may build their own home without a contractor license. On work over $40,000, the county requires an owner affidavit and you can’t sell, rent or lease for 12 months after the CO.
Septic site prep

Before Environmental Health visits.

Diagram of a lot with four backhoe pits, flagged corners and a staked houseStaked housepitpitpitpitSIGNflagged corners
  • Flag every property corner and mark lines every 50 ft
  • Stake the house location
  • Dig at least 4 backhoe pits, 4 ft deep and 2 ft wide, 80–100 ft apart (6–8 for homes over 4 bedrooms)
  • Post a neon-orange sign at the road
  • A return trip because the site wasn’t ready costs $100
On the water

Docks, piers and shoreline work.

Badin LakeShoreline permits come from Cube Hydro Carolinas (Cube Yadkin Generation) under its FERC license: piers, stabilization, dredging and vegetation removal. New pier application $250; annual renewal $100. Office 704-422-5555, 293 Hwy. 740, Badin.Cube shoreline management ↗
Lake TilleryShoreline activity permits come from Duke Energy through its Lake Access Permit System. Email LakeServices@duke-energy.com.Duke Energy lake permits ↗
Plus the countyBoat docks need county plan review and a building permit; docks on Duke Energy property can’t use the small-project exemption.
Who to call

Permit offices & contacts.

CountyCentral Permitting1000 N. First St., Suite 13, Albemarle
704-986-3667 · Mon–Fri 8:30 a.m.–5 p.m.
Website ↗ OpenGov portal ↗
CountyBuilding InspectionsDirector Chris Moon · 704-986-3674
Field inspections Mon–Fri 7:30 a.m.–4 p.m.
Inspections & codes ↗
CountyPlanning & Zoning704-986-3660 · Director Bailey Cline
Zoning ordinance, rezoning, variances, subdivisions
Planning & Zoning ↗
CountyEnvironmental HealthSuite 13-A · 704-986-3675
Septic site evaluations and well permits
Environmental Health ↗
CountyFire Marshal201 S. Second St., Albemarle
704-986-3655 · burn, tent and fireworks permits
Fire services ↗
StateNCDOT Division 10District 1 (Cabarrus & Stanly), 615 Concord Rd., Albemarle · Division office 704-983-4400NCDOT driveway permits ↗
StateN.C. Forest Service26032-D Newt Rd., Albemarle · 704-982-5317
Burn permits for fires near woodland
Get a burn permit ↗
TownCity of AlbemarlePlanning & Development Services
144 N. Second St.
City permitting ↗
TownOther townsLocust, Norwood, Oakboro, Stanfield, Richfield and New London run their own zoning.Locust ↗ Norwood ↗ All town guides →
Quick answers

Stanly County permit FAQ

Who issues building permits in Albemarle?

Stanly County does. The City of Albemarle handles zoning, fire code and utility review and issues a City Coordination Form; the county’s Building Codes Enforcement then reviews plans, issues the building permit and performs inspections.

Do I need a permit for a shed in Stanly County?

A residential accessory building up to 12 × 12 ft (144 sq. ft.) with no side over 12 ft takes a “non-required permit” applied for in person, plus zoning and Environmental Health clearance. Larger buildings need a building permit, and metal buildings with any side over 12 ft need engineered plans.

How much is a building permit in Stanly County?

For new homes, the county values work at $150 per heated and $100 per unheated square foot and charges 0.5% of that value, with a $50 minimum per trade. A 1,800 sq. ft. house with a 500 sq. ft. garage is valued at $320,000, or about $1,600 in building permit fees, before zoning, septic, well and other charges. Use the estimator above.

Do I need a permit to burn leaves or brush?

Yes. The county’s open-burning permit is free through the Fire Marshal, and fires within 500 feet of woodland also need an N.C. Forest Service permit, available online. Burn bans override permits.

Do I need a business license in Stanly County?

North Carolina eliminated most local privilege license taxes in 2015, so there is no general business license. You may still need zoning approval for your location or home occupation, Environmental Health permits for food, and state licenses for regulated trades or alcohol.

When do I need an erosion control plan?

Disturbing more than one acre requires an approved erosion and sedimentation control plan from the N.C. Department of Environmental Quality, filed at least 30 days before work begins.

More county services

Plain-English guides to the offices Stanly County residents call most.

The whole county

All ten towns. One map.

Explore more maps →

Choose a town on the map or in the list below. Points are the U.S. Census Bureau’s published municipal reference locations; use the street maps for local directions.

Geographic orientation: 2025 U.S. Census Bureau county boundaries and municipal Gazetteer reference points. These identify communities, rather than visitor entrances or town halls. Locust also extends into Cabarrus County.
Roads & neighborhoods

Find your way around.

Zoom into the county’s towns, roads and lakes. Open Google Maps for a route to your chosen destination.

Stanly County geographic map; open the county street map

Open county street map ↗ · Parks & lakes guide →